Free Construction Reference Charts
30 printable lookup tables for the numbers a job runs on: roof pitch and squares, siding and gables, concrete yards and bags, tile and thinset, paint, drywall, flooring, gravel, stairs, AC tons, wire sizes, markup against margin. Every one prints as a PDF. No signup and no watermark.
Roofing
Pitch, slope and squares. The two tables a roofer reaches for before anything gets ordered.
Siding and exterior walls
Squares, gables and starter strip. The walls priced before a single triangle has been measured.
Concrete, asphalt and lumber
Yards, bags, tons and board feet. What a supply house asks for when you call it in.
Inside the house
Rooms, sheets, gallons, boxes and stairs. Everything measured off a floor plan.
Landscape and yard
Beds, depths and coverage, for the material that is sold by the yard and delivered by the ton.
Decks, fences and insulation
Boards, posts, rails and bags. What gets counted off a sketch before anybody calls the yard.
Heating, cooling and wiring
Tons, BTU and conductor sizes. The two lookups that settle an argument about equipment before anybody prices it.
Markup and margin
Markup against margin, and what a monthly late fee really costs a customer in a year.
Pricing your own work
What an hour really costs, what to charge for it, and what overhead and profit do to a price.
Getting paid
Retainage and draw schedules. The two places where a profitable job still runs out of cash.
Every number here was computed, not copied
Reference charts on the internet get copied from each other, and an error copied four times looks like a consensus. The 4,232 figures across these 30 pages were all produced at build time by the same calculator engine that runs on this site, from the formulas written out in plain arithmetic in the calculators.
That has a practical consequence worth knowing about. If a formula on this site were wrong, it would be wrong on the chart, on the calculator and in the printed PDF at the same time, in public, instead of hiding inside one page nobody checks. The assumptions behind each number, the bag yields, the coverage rates and the waste allowances, are written into the note under every table rather than buried.
A chart is for the counter, a calculator is for the job
These tables are for the moments where you want a number in five seconds and an order of magnitude you can sanity check: standing at a supply counter, on the phone with a customer, deciding whether the trailer or the truck goes to the yard.
When it is time to actually order, use the calculator for the same trade. It takes your real measurements instead of the nearest row, and it hands back the whole material list as a document you can print or send, rather than a single figure on a screen.
Print them and put them somewhere
Every chart page has a PDF of the same table, sized for US Letter, with nothing on it but the chart and its notes. Inside a truck door, on the trailer wall, in the back of the estimating binder. That is what a reference chart is for, and a phone in a wet glove is not a good substitute.
What these are not
They are estimating figures. Nothing on them sizes a beam, checks a load, or replaces a local code, a permit or a manufacturer's installation instruction. Where a number depends on a product, a soil type or a state rule, the note says so, and that is the point at which the specification stops being a chart's business.