ContractorHandbook

Paver Calculator: Pavers, Base Gravel and Polymeric Sand

Patio size and paver size in, and it returns the paver count, the gravel base in cubic yards and tons, the bedding sand, the polymeric sand and the feet of edge restraint. The base is the line most people get wrong, and it is usually the largest thing on the truck.

It does not stop at a number.

When the figures look right, the paver material list downloads as a real PDF with your business details on it, built inside your own browser. Nothing you type is uploaded anywhere.

waste10%patio area, sq ftpaver size plus the joint sets pavers per sq ftarea x pavers per sq ft, plus base stone and bedding sand
The pavers are the visible half of the job and the cheap half of the excavation. Under them sits six inches of compacted base and an inch of bedding sand, and both come off the same area, which is why they are on the material list.

Worked example

These are the figures the calculator opens with and the answer it gives. Change anything above and every number below moves with it.

  • Patio length20 ft
  • Patio width12 ft
  • Paver length8 in
  • Paver width4 in
  • Paver thickness2.375 in
  • Joint width0.0625 in
  • Compacted gravel base6 in
  • Bedding sand1 in
  • Waste allowance10 %

Pavers to buy1,161 pavers

Patio area240 sq ft
One paver covers0.227 sq ftface plus one joint
Pavers per sq ft4.4
Pavers before waste1,056
Base gravel, compacted4.44 cu yd
Base gravel to order5.33 cu yd20% added for compaction
Base gravel weight7.47 tons
Bedding sand0.74 cu yd2,000 lb
Polymeric sand, 50 lb bags380 sq ft per bag
Edge restraint64 ft

The material list this produces

Pavers1,161
Base gravel, cu yd5
Bedding sand, cu yd1
Polymeric sand, 50 lb bags3
Edge restraint, ft64
Edging spikes64
Geotextile fabric, sq ft264

What this calculator assumes

  • The joint default is 1/16 of an inch because concrete pavers are cast with spacer nubs on the sides and that is the joint you get when they are set tight. A hand set joint at 1/8 or wider takes noticeably more polymeric sand, so type the joint you are actually laying.
  • Waste is 5 percent for a running bond laid square to the edges, 10 for most patios, and 15 or more for herringbone or a circle kit, because every angled cut throws away most of a paver.
  • Base gravel is quoted compacted. Crushed stone loses about a fifth of its loose volume under a plate compactor, so the order line adds 20 percent back.
  • Four inches of compacted base suits a foot traffic patio on good soil. Six is the common default, and eight to twelve is driveway and heavy clay territory.
  • Polymeric sand is the volume of the joints at the full thickness of the paver, at about 100 pounds per cubic foot.
  • Weights use 2,800 lb per cubic yard for crushed stone and 2,700 for bedding sand.

The paver count comes from the joint, not the catalog

A 4 by 8 paver is sold as covering 4.5 to the square foot, and it would, if the pavers touched. They do not. Every paver sits inside a cell of its own face plus one joint, so the real figure at a 1/16 inch joint is 4.4 per square foot, and at 1/8 it drops to 4.3.

On a 20 by 12 patio that is 1,161 pavers against 1,135, a difference of 26. That is small, but it runs the other way from the direction people guess, and the catalog number leaves you short rather than long.

Large format is where it shows up properly. The same 240 square feet in 12 by 12 pavers is 262 pieces, and in 6 by 6 it is 1,035. Type the actual face size of what you are buying rather than the nominal name on the pallet tag.

The base is most of the order and all of the failure

Six inches of compacted gravel under a 240 square foot patio is 4.44 cubic yards in place. Crushed stone loses about a fifth of its loose volume under a plate compactor, so the order is 5.33 cubic yards, which is 7.47 tons and more than one delivery on a small truck.

Four inches is enough for a foot traffic patio on ground that drains. Six is the default because most ground is not that. Eight to twelve is what a driveway or heavy clay wants, and the calculator warns rather than silently accepting anything under four.

Base gets compacted in lifts of three or four inches, not in one pass. A twelve inch base rolled in one go is a twelve inch base that settles, and settled pavers are a rebuild rather than a repair.

Polymeric sand is sold by coverage and bought by joint volume

Bag coverage charts assume a joint. Change the joint and the coverage changes with it, because the sand is filling a volume rather than a surface. That 20 by 12 patio takes 3 bags at a 1/16 inch joint and 5 at 1/8, from exactly the same paver count.

The default here is 1/16 because concrete pavers are cast with spacer nubs on their sides, and set tight that is the joint you get. A hand set joint, a tumbled paver with a rounded edge, or a flagstone pattern all open up and all take more.

Sweep it in dry, blow the faces clean before you wet it, and wet it the way the bag says. Polymeric sand left on the surface hazes, and it is far easier to keep it off than to get it off.

Edge restraint is not optional and it is easy to leave off

That same patio needs 64 feet of edge restraint, one lap of the perimeter, plus a spike about every foot. Without it the outer course creeps outward under traffic, the joints open, the sand washes and the field starts to move.

Restraint goes on the compacted base and beyond the paver edge, not on the bedding sand. Setting it on the sand is the single most common installation fault, because the sand moves and takes the restraint with it.

Geotextile under the base is on the list at 10 percent over the area. It is not structural, it keeps the subgrade from pumping up into the stone, and on clay it is the difference between a base that lasts and one that turns to mud.

Questions people ask

How many pavers do I need for a 12 by 20 patio?

About 1,161 standard 4 by 8 pavers with a 1/16 inch joint and 10 percent waste. The bare count is 1,056 and the waste covers the cuts at the edges. Large format changes it completely: the same patio is 262 pieces in 12 by 12.

How much gravel do I need under pavers?

Six inches compacted under a 240 square foot patio works out to 4.44 cubic yards in place, so order 5.33 to allow for compaction, which is about 7.47 tons. Four inches is enough on ground that drains, and a driveway wants eight to twelve.

How many bags of polymeric sand do I need?

Three 50 pound bags for a 240 square foot patio at a 1/16 inch joint, and five for the same patio at 1/8. The sand fills a volume, so the joint width matters more than the area does.

How much waste should I allow for pavers?

Five percent for a running bond laid square to the edges, 10 for most patios, and 15 or more for herringbone or a circle kit. Every angled cut throws away most of a paver, so a diagonal pattern costs material before it costs labor.

Need the paperwork too?

Free Contractor Estimate Template, free, no signup, PDF Word and Excel.

Common sizes, worked out

The same calculator with the numbers already filled in, one page per size, each ending in its own material list.

Put this calculator on your own site

Free to embed. The only condition is the one line of credit already in the snippet, and there is no tracking of your visitors beyond a page view. Paste this where you want it to appear. It resizes itself.

It comes light, because most of the pages it goes on are light. If your site is dark, put ?theme=dark on the end of the iframe address, or ?theme=auto to follow whatever each reader has set on their own device.

Related calculators