How Much Concrete for a 12x12 Slab?

Concrete needed

1.96 cubic yards

A 12 by 12 slab at four inches, with ten percent on top for waste.

It does not stop at a number.

When the figures look right, the concrete material list downloads as a real PDF with your business details on it, built inside your own browser. Nothing you type is uploaded anywhere.

length, ftthickness, inwidth, ftlength x width x (inches / 12) / 27 = cubic yards
Concrete is priced by the cubic yard and poured by the inch. The calculator turns the thickness into feet, multiplies out the volume, divides by 27, then rounds up to the quarter yard the truck actually sells.

How that number is worked out

These are the figures this page was built with and every line the calculator produces from them. Change anything above and all of it moves.

  • Length12 ft
  • Width12 ft
  • Thickness4 in
  • Waste allowance10 %

Concrete needed1.96 cubic yards

Volume48 cu ft
Cubic yards before waste1.78
Cubic yards with 10% waste1.96order to this number
Order in quarter yards2 cu yd
60 lb bags, if bagging it118
80 lb bags, if bagging it88

The material list this produces

Ready mix concrete, cubic yards2
Rebar or mesh, sq ft of slab144
Form lumber, linear ft48

Thickness compared

Thickness is the one number on this page worth arguing about, so here is the same slab at each of the usual four.

ThicknessConcrete needed
4 in1.96 cubic yards
5 in2.44 cubic yards
6 in2.93 cubic yards
8 in3.91 cubic yards

What else matters here

A hundred and forty four square feet at four inches lands almost exactly on two cubic yards with waste, which makes this an easy one to order and an easy one to check. If a supplier quotes you very far off two yards for this slab, something in the conversation is wrong.

Twelve feet is also the width at which control joints stop being optional. The rule of thumb is that a joint should fall every 24 to 36 times the slab thickness, so a four inch slab wants joints every eight to twelve feet. On a 12 by 12 that means one cut across the middle in each direction, giving four six foot squares.

Cut them, tool them or set them, but do it within the first day. Concrete is going to crack as it shrinks; a joint is simply you deciding where. A slab left uncut for a week has already made that decision for you.

What this calculator assumes

  • One cubic yard is 27 cubic feet. A 4 inch slab is one third of a foot thick, not 4.
  • A 60 lb bag yields about 0.45 cubic feet and an 80 lb bag about 0.60. Bags are for small pours only; past about one cubic yard, ready mix is cheaper and far less work.
  • Ready mix is usually sold in quarter yard steps with a short load fee below one yard.

Questions people ask

How many yards of concrete for a 12x12 slab?

1.78 cubic yards of volume, 1.96 with a ten percent waste allowance, so you order two yards. At six inches it is just under three.

How many 80 lb bags for a 12x12 slab?

Around 88 at four inches thick with waste in. At that count, ready mix is cheaper and takes a fifth of the time, so bags only make sense if a truck cannot reach the site.

Where do the control joints go on a 12x12 slab?

One cut in each direction through the middle, six feet from each edge, on a four inch slab. Cut to a quarter of the slab depth, so one inch, within the first 24 hours.