How Much Concrete for a 16x20 Slab?

Concrete needed

4.35 cubic yards

A 16 by 20 foot slab at four inches, with ten percent on top for waste.

It does not stop at a number.

When the figures look right, the concrete material list downloads as a real PDF with your business details on it, built inside your own browser. Nothing you type is uploaded anywhere.

length, ftthickness, inwidth, ftlength x width x (inches / 12) / 27 = cubic yards
Concrete is priced by the cubic yard and poured by the inch. The calculator turns the thickness into feet, multiplies out the volume, divides by 27, then rounds up to the quarter yard the truck actually sells.

How that number is worked out

These are the figures this page was built with and every line the calculator produces from them. Change anything above and all of it moves.

  • Length16 ft
  • Width20 ft
  • Thickness4 in
  • Waste allowance10 %

Concrete needed4.35 cubic yards

Volume106.7 cu ft
Cubic yards before waste3.95
Cubic yards with 10% waste4.35order to this number
Order in quarter yards4.5 cu yd
60 lb bags, if bagging it261
80 lb bags, if bagging it196

The material list this produces

Ready mix concrete, cubic yards4.5
Rebar or mesh, sq ft of slab320
Form lumber, linear ft72

Thickness compared

Thickness is the one number on this page worth arguing about, so here is the same slab at each of the usual four.

ThicknessConcrete needed
4 in4.35 cubic yards
5 in5.43 cubic yards
6 in6.52 cubic yards
8 in8.69 cubic yards

What else matters here

Three hundred and twenty square feet is a single car garage floor, a generous patio or a one bay workshop. At four inches it is four and a half yards, which is the point where the pour stops being a job you can think your way through as it happens.

Four and a half yards arrives as one truck and comes off the chute in about twenty minutes if the driver is in a hurry, and drivers are usually in a hurry. Before it arrives, have the forms braced, the mesh chaired up off the base, a screed board cut to length, and one person whose only job is running the screed.

At this size the base matters more than the concrete. Four inches of compacted crushed stone under the slab does more for its life than an extra inch of concrete on top, because almost every slab failure at this scale is the ground moving rather than the concrete breaking.

What this calculator assumes

  • One cubic yard is 27 cubic feet. A 4 inch slab is one third of a foot thick, not 4.
  • A 60 lb bag yields about 0.45 cubic feet and an 80 lb bag about 0.60. Bags are for small pours only; past about one cubic yard, ready mix is cheaper and far less work.
  • Ready mix is usually sold in quarter yard steps with a short load fee below one yard.

Questions people ask

How many yards of concrete for a 16x20 slab?

3.95 cubic yards at four inches, 4.35 with a ten percent waste allowance, so order 4.5. At six inches the same slab is about 6.5 yards.

How thick should a garage floor be?

Four inches is the minimum for cars. Go to six for a truck, an RV, a lift or heavy machinery, and use rebar rather than mesh if anything with a real axle load will sit on it.

Do I need rebar in a 16x20 slab?

Yes, or at least wire mesh. Anything over about ten feet in a direction will crack somewhere, and reinforcement is what keeps the two sides of that crack in the same plane.