Concrete needed

12.22 cubic yards

A 30 by 30 foot slab at four inches, with ten percent on top for waste.

It does not stop at a number.

When the figures look right, the concrete material list downloads as a real PDF with your business details on it, built inside your own browser. Nothing you type is uploaded anywhere.

length, ftthickness, inwidth, ftlength x width x (inches / 12) / 27 = cubic yards
Concrete is priced by the cubic yard and poured by the inch. The calculator turns the thickness into feet, multiplies out the volume, divides by 27, then rounds up to the quarter yard the truck actually sells.

How that number is worked out

These are the figures this page was built with and every line the calculator produces from them. Change anything above and all of it moves.

  • Length30 ft
  • Width30 ft
  • Thickness4 in
  • Waste allowance10 %

Concrete needed12.22 cubic yards

Volume300 cu ft
Cubic yards before waste11.11
Cubic yards with 10% waste12.22order to this number
Order in quarter yards12.25 cu yd
60 lb bags, if bagging it734
80 lb bags, if bagging it550

The material list this produces

Ready mix concrete, cubic yards12.25
Rebar or mesh, sq ft of slab900
Form lumber, linear ft120

Thickness compared

Thickness is the one number on this page worth arguing about, so here is the same slab at each of the usual four.

ThicknessConcrete needed
4 in12.22 cubic yards
5 in15.28 cubic yards
6 in18.33 cubic yards
8 in24.44 cubic yards

What else matters here

Nine hundred square feet and twelve and a quarter yards, which is more than most ready mix trucks carry. Typical drum capacity is eight to ten yards, so this is two loads, and two loads means the second truck has to arrive while the first pour is still workable.

That scheduling is the job. Trucks are dispatched, not summoned, and a second load that turns up forty minutes late leaves a cold joint across a shop floor. Book both loads together, tell the dispatcher it is a continuous pour, and have the placing crew sized so the first load is down and screeded before the second arrives.

At four inches this is a shop or barn floor for foot traffic and light storage. Anything with a vehicle lift, a press or stacked material wants six inches minimum and a properly engineered base, and at that point it is worth having the thickness specified by somebody who has seen the loads rather than taken from a table.

What this calculator assumes

  • One cubic yard is 27 cubic feet. A 4 inch slab is one third of a foot thick, not 4.
  • A 60 lb bag yields about 0.45 cubic feet and an 80 lb bag about 0.60. Bags are for small pours only; past about one cubic yard, ready mix is cheaper and far less work.
  • Ready mix is usually sold in quarter yard steps with a short load fee below one yard.

Questions people ask

How much concrete for a 30x30 slab?

About 12.22 cubic yards at 4 inches with waste, which is two ready mix loads for most suppliers.

How many yards does a concrete truck hold?

Commonly eight to ten. A 30 by 30 slab at four inches needs two loads, booked together as a continuous pour.

How thick should a shop floor be?

Four inches for foot traffic and light storage. Six inches minimum for vehicles, lifts or stacked material, over a base built for the load.

Different numbers?

The concrete calculator takes any dimensions you like and hands back the same list.