Concrete needed

24.44 cubic yards

A 30 by 40 foot shop slab at six inches, with ten percent on top for waste.

It does not stop at a number.

When the figures look right, the concrete material list downloads as a real PDF with your business details on it, built inside your own browser. Nothing you type is uploaded anywhere.

length, ftthickness, inwidth, ftlength x width x (inches / 12) / 27 = cubic yards
Concrete is priced by the cubic yard and poured by the inch. The calculator turns the thickness into feet, multiplies out the volume, divides by 27, then rounds up to the quarter yard the truck actually sells.

How that number is worked out

These are the figures this page was built with and every line the calculator produces from them. Change anything above and all of it moves.

  • Length30 ft
  • Width40 ft
  • Thickness6 in
  • Waste allowance10 %

Concrete needed24.44 cubic yards

Volume600 cu ft
Cubic yards before waste22.22
Cubic yards with 10% waste24.44order to this number
Order in quarter yards24.5 cu yd
60 lb bags, if bagging it1,467
80 lb bags, if bagging it1,100

The material list this produces

Ready mix concrete, cubic yards24.5
Rebar or mesh, sq ft of slab1,200
Form lumber, linear ft140

Thickness compared

Thickness is the one number on this page worth arguing about, so here is the same slab at each of the usual four.

ThicknessConcrete needed
4 in16.3 cubic yards
5 in20.37 cubic yards
6 in24.44 cubic yards
8 in32.59 cubic yards

What else matters here

Twelve hundred square feet at six inches is twenty four and a half yards, which is three truckloads at a typical nine or ten yard load. That is no longer a pour you organize on the morning of, it is a pour you schedule.

With three trucks the whole job turns on spacing. Fifteen to twenty minutes between them keeps a continuous edge without leaving a truck sitting and building up a load charge. Tell the dispatcher the spacing you want rather than the times you want, because they are managing a plant, not your slab.

At this size, rent the power trowel before you need it and put somebody on the slab whose only job is watching the surface. A pour this big changes state across its own area, so one end can be ready to trowel while the other is still bleeding, and chasing that is what the extra person is for.

What this calculator assumes

  • One cubic yard is 27 cubic feet. A 4 inch slab is one third of a foot thick, not 4.
  • A 60 lb bag yields about 0.45 cubic feet and an 80 lb bag about 0.60. Bags are for small pours only; past about one cubic yard, ready mix is cheaper and far less work.
  • Ready mix is usually sold in quarter yard steps with a short load fee below one yard.

Questions people ask

How many yards of concrete for a 30x40 slab?

22.22 cubic yards at six inches, 24.44 with a ten percent waste allowance. At four inches it is 16.3 with waste, but a shop floor at four inches will not take forklift or trailer traffic.

How many trucks is a 30x40 slab?

Three at a typical nine yard load, or two and a half if your supplier runs ten yard trucks. Order them spaced fifteen to twenty minutes apart so the edge never sets between loads.

How thick should a pole barn floor be?

Six inches for general shop use with vehicles and equipment. Go to eight, with an engineered rebar layout, if a loaded forklift or a lift will work on it.